TYPICAL PROJECT
Shanghai Vopak Logistics Terminal Project


 

PROJECTBRIEF:

  • Shanghai Logistics Terminal Project is located at Plot C1 of Shanghai Chemical Industrial Park (SCIP), on the north bank of Hangzhou Bay, Jinshan District, Shanghai.  
  • The main function is to provide 13 multinational clients with facilities for loading, unloading, storage, and handling of raw and finished products of the 900,000 tpa Ethylene Plant, 250,000 tpa Caustic Soda Plant, 300,000 tpa PVC Plant, 250,000 tpa Phenol Acetone and THF Plant as well as MDI/TDI, Polycyanate and PCA.
  • Project was completed in phase 1AB, 1D, 1E, 1F and 1G.


Main Contract Scope:

  • Off Shore:
  • Pipe rack, piping, equipment, electrical and instrumentation work for Jetty, trestle, branch, 6 nos. berths, 2 FF platform;
  • On Shore:
  • Utility tank farm, 8 product storage tank farm, FF house, main substation, air compressor house, waste water treatment plant, 8 nos. product pump house, hazardous warehouse, cold-storage warehouse, temp. control warehouse, unfrozen warehouses, drum filling platform, truck loading bays, office complex, lab. building, sample building and FF Workshop.


WorkSummary:

Engineering Design, Procurement, Construction, Testing & Commissioning:

  • Construction area: 121,889m2
  • Tank farm:   68 nos.  (324000 m3)
  • Pipeline: 280 km
  • S. structure: 5530 tons
  • Equipment: 450 sets
  • Power cable: 650 km.
  • Control cable: 660 km
  • Electrical equipment: 2510 sets
  • Instrument: 2521 sets
  • Road and paving: 88,000 m2


CLIENT:Vopak Shanghai Logistics Co.Ltd.           LOCATION: Shanghai China


DURATION:2003-2022


  • Next:Supply & Installation of 400KV Power Cables, Auxiliary Cables and Accessories- NDC 199